HEAT INSLUATION FOR ROOFS
The project was implemented with great care in terms of specifications and implementation steps to match the specifications of the entire works from the basement to the roofs
HEAT INSLUTATION WITH MEMBRANE WATERPROOFING
The project was implemented based on the technical specifications of the Ministry of Public Works
789
Hours of Work
Juli 2015
Construction Date
3820ft
Surface Area
1.800.000$
Budget
MAMBRANE INSULATION STEP
The project was implemented with great care in terms of specifications and implementation steps to match the specifications of the entire works from the basement to the roofs
ROOF WORKS
The project was implemented with great care in terms of specifications and implementation steps to match the specifications of the entire works from the basement to the roofs